• Orissa Power Scenario
 
Installed Capacity (MW) & System Demand
<<BACK
Hydro 1918.875 MW
Thermal 880.000 MW
Total 2798.875 MW
GRIDCO's Share From Central Sector 690.460 MW
Grand Total 3489.335 MW
Hydro Thermal Mix Ratio 2.18 : 1
GRIDCO's Average Demand 1583 MW
During OCT-03
Morning Peak 1858 MW
At 09.00 Hr On 27.10.03
Evening Peak 2127 MW
At 20.00Hr On 20.10.03
Peak System Demand 1850MW

STATE SECTOR GENERATION
SL. NAME OF POWER STATION

INSTALLED CAPACITY ( MW)

FIRM POWER (MW)

1.

O.H.P.C.    
  HIRAKUD POWER STATION    
  (a)BURLA

 

 

(b)CHIPLIMA 

2x49.5  =  99 

*2x24.0  = 48  

3X37.5  = 112.5

3x24  = 72 

331.5

 

134

  BALIMELA POWER HOUSE 6x60    =                     360

135

  RENGALI POWER HOUSE 5x50    =                     250

85.7

  UPPER KOLAB POWER HOUSE 4x80    =                     320

95

  INDRAVATI POWER HOUSE 4x150  =                     600

225

  MACHHKUND POWER HOUSE

( Orissa  Share 50%)

3x17     =  51

3x21.25 = 63.75

57..375

40

  TOTAL HYDRO , (A)              =                 1918.875

 

2.

N.T.P.C.(TAKEN OVER)  

 

  TTPS STAGE-I** 4x60      =                  240

151

  TTPS STAGE - II 2x110    =                  220

138

 

TOTAL TTPS              =                  460

 

3.

O.P.G.C.  

 

  

IB  TPS 2x210    =                 420

300

  

TOTAL THERMAL , (B)              =                 880

 

 

(*) Unit 3 &4 OF HPS (24)MW UNDER R&M (PROPOSED TO BE UPGRADED TO (49.5) MW 

( ** ) ->  62.5 MW  UNIT DERATED TO 60 MW  

CENTRAL SECTOR GENERATION

SL.NO. NAME OF POWER STATION

INSTALLED CAPACITY IN MW

SHARE OF GRIDCO  #

FIRM POWER (MW)

(AT 68.49% PLF& 11% AUX. CONS.)

SHARE ( %) MW   Share %MW 
1. CHUKHA ( BHUTAN ) 4x84     =  336 15.19

41

30    *
2. RANJIT ( SIKKIM ) 3x20     =  60 NIL NIL  
3. KURICHU ( BHUTAN ) 4x15     =  60 NIL NIL  
4. FARAKKA( WEST BENGAL ) 3x200   =  600

2x500   =  1000

15.37

246

175
5. KAHALGAON ( BIHAR ) 4x210    =  840

11.43

96

 68
6. TSTPP, KANIHA (ORISSA) 2x500    =  1000

2x500    =  1000

  31.90

NIL

319

NIL

227
   TOTAL (C)      

702

 

GRAND TOTAL , (A) + (B) + (C) =  3500.875 
* GRIDCO HAS GOT  A SHARE OF 17.4% OF ACTUAL RECEIPT OF BIRAPARA ( INDIA ), WHICH WORKS OUT TO BE 30.00 MW AVERAGE  ON DAILY BASIS.  

  # Implemented with effect from 01.10.04.   

MAJOR CPP

SL. NAME OF CPP INSTALLED CAPACITY IN MW TOTAL (MW)
1 NALCO, ANGUL 8 x 120 960
2 RSP, ROURKELA 2 x60 + 5 x 25 + 1 x 3 248
3 ICCL, CHOUDWAR 2 x54 108
4 HINDALCO, HIRAKUD 1 x 67.5 + 1x100 167.5
5 M/S BHUSHAN STEEL 1x63 63
 