|
|
|
|
Installed
Capacity (MW) & System Demand |
<<BACK |
Hydro |
1918.875
MW |
Thermal |
880.000
MW |
Total |
2798.875
MW |
GRIDCO's
Share From Central Sector |
690.460
MW |
Grand
Total |
3489.335
MW |
Hydro
Thermal Mix Ratio |
2.18
: 1 |
GRIDCO's
Average Demand |
1583
MW
During OCT-03 |
Morning
Peak |
1858
MW
At 09.00 Hr On 27.10.03 |
Evening
Peak |
2127
MW
At 20.00Hr On 20.10.03 |
Peak
System Demand |
1850MW |
STATE
SECTOR GENERATION
SL.
|
NAME
OF POWER STATION
|
INSTALLED
CAPACITY ( MW)
|
FIRM
POWER (MW)
|
1.
|
O.H.P.C.
|
|
|
|
HIRAKUD
POWER STATION
|
|
|
|
(a)BURLA
(b)CHIPLIMA
|
2x49.5
= 99 *2x24.0
= 48
3X37.5
= 112.5
3x24
= 72
|
331.5
|
134
|
|
BALIMELA
POWER HOUSE
|
6x60
=
360 |
135
|
|
RENGALI
POWER HOUSE
|
5x50
=
250
|
85.7
|
|
UPPER
KOLAB
POWER HOUSE
|
4x80
=
320
|
95
|
|
INDRAVATI
POWER HOUSE
|
4x150
=
600
|
225
|
|
MACHHKUND
POWER HOUSE
(
Orissa Share
50%)
|
3x17
= 51
3x21.25
= 63.75
|
57..375
|
40
|
|
TOTAL
HYDRO , (A)
|
=
1918.875
|
|
2.
|
N.T.P.C.(TAKEN
OVER)
|
|
|
|
TTPS
STAGE-I**
|
4x60
=
240
|
151
|
|
TTPS
STAGE - II
|
2x110
=
220
|
138
|
|
TOTAL
TTPS
|
=
460
|
|
3.
|
O.P.G.C.
|
|
|
|
IB
TPS
|
2x210
=
420
|
300
|
|
TOTAL
THERMAL , (B)
|
=
880
|
|
(*) Unit 3 &4 OF HPS (24)MW UNDER R&M (PROPOSED TO BE UPGRADED
TO (49.5) MW
(
** ) -> 62.5
MW UNIT
DERATED TO 60 MW
CENTRAL
SECTOR GENERATION
SL.NO.
|
NAME
OF POWER STATION
|
INSTALLED
CAPACITY IN MW
|
SHARE
OF GRIDCO #
|
FIRM
POWER (MW)
(AT
68.49% PLF& 11% AUX. CONS.)
|
SHARE
( %)
|
MW
|
| Share % | MW | |
1.
|
CHUKHA
(
BHUTAN
)
|
4x84
= 336
|
15.19
|
41
|
30
*
|
2.
|
RANJIT
(
SIKKIM
)
|
3x20
= 60
|
NIL
|
NIL
|
|
3.
|
KURICHU
(
BHUTAN
)
|
4x15
= 60
|
NIL
|
NIL
|
|
4.
|
FARAKKA(
WEST BENGAL
)
|
3x200
= 600
2x500
= 1000
|
15.37
|
246
|
175
|
5.
|
KAHALGAON
(
BIHAR
)
|
4x210
= 840
|
11.43
|
96
|
68
|
6.
|
TSTPP,
KANIHA (ORISSA)
|
2x500
= 1000
2x500
= 1000
|
31.90
NIL
|
319
NIL
|
227
|
|
TOTAL
(C)
|
|
|
702
|
|
GRAND TOTAL , (A) + (B) + (C) =
3500.875
* GRIDCO HAS GOT
A SHARE OF 17.4% OF ACTUAL RECEIPT OF BIRAPARA
(
INDIA
), WHICH WORKS OUT TO BE 30.00 MW AVERAGE
ON DAILY BASIS.
# Implemented with effect from 01.10.04.
MAJOR CPP
SL.
|
NAME
OF CPP
|
INSTALLED
CAPACITY IN MW
|
TOTAL
(MW)
|
1
|
NALCO,
ANGUL
|
8
x 120
|
960
|
2
|
RSP,
ROURKELA
|
2
x60 + 5 x 25 + 1 x 3
|
248
|
3
|
ICCL,
CHOUDWAR
|
2
x54
|
108
|
4
|
HINDALCO,
HIRAKUD
|
1
x 67.5 + 1x100
|
167.5
|
5
|
M/S
BHUSHAN STEEL
|
1x63
|
63
|
|
<<BACK |
|
* Last Modified on 26th September '05 |
|
|
|