Sl.
No. |
Description. |
Unit weight.
MT
|
Quantity
MT/Nos/Sets/Km as the case may be |
Unit Rate
|
Amount.
Rs. |
(A) |
TOWER STRUCTURES. |
|
|
|
|
1. |
Lattice type Galvanized steel
tangent tower (PA type) with stubs and cleats. Sets.
(1)
PA type-7 nos
|
3.245
|
22.715 MT
|
|
|
2 |
Lattice type galvanized steel 60
degree angle tower with sttrubs and cleats (PC type) Sets.
(1)
PC type-3 Nos
|
5.914
|
17.742 MT
|
|
|
5 |
TOTAL WEIGHT OF TOWER. |
40.457MT |
|
|
|
|
The above line towers are
tenative and it may vary as per tower design of contractor and as per
actual site condition |
|
|
|
|
6 |
Supply of the total galvanized
Nuts & Bolts for the above towers of 16 mm dia as per specification. |
2.50MT |
|
|
|
7 |
SUPPLY OF TOWER ACCESSORIES. |
|
|
|
|
a |
Earthing Device. |
10 Nos. |
|
|
|
b |
Danger Plate. |
10 Nos. |
|
|
|
c |
Number Plate. |
10 Nos. |
|
|
|
d |
Phase Plate. |
60 Nos. |
|
|
|
e |
Bird guard |
42 Nos. |
|
|
|
f |
Anti climbing device. |
10 Nos. |
|
|
|
g |
Circuit Plate. |
20 Nos. |
|
|
|
8. |
Total cost of tower
fixture. |
|
|
|
|
|
POWER CONDUCTOR. |
|
|
|
|
a |
Total cost of the ACSR Panthor
Conductor. wth 1.5% provision for sag and wastage. |
15.225 Kms. |
|
|
|
|
CONDUCTOR ACCESSORIES. |
|
|
|
|
a |
Preformed armoured rod. |
42 Set |
|
|
|
b |
Stock bridge VIB. Damper |
120 Nos. |
|
|
|
c |
Mid span compressor joints
|
10 Nos. |
|
|
|
e |
REPAIR SLEEVES @
ONE/ COND./ KM. |
15 Nos. |
|
|
|
9 |
Total cost
of conductor Accessories. |
|
|
|
|
|
EARTH WIRE: |
|
|
|
|
|
Total cost of earth
wire with 1.5% provision for SAG & Wastage. |
2.54 Kms. |
|
|
|
|
Earth wire
accessories. |
|
|
|
|
a |
Vibration Damper
(stock bridge type) |
20 Nos. |
|
|
|
b |
Flexible copper
Bonding pieces. |
10 Nos. |
|
|
|
c |
Suspension clamp. |
7 Nos. |
|
|
|
d |
Tension clamp. |
6 Nos. |
|
|
|
e |
Mid Span compressor
joint. |
5 Nos.
|
|
|
|
10 |
Total cost
of earth wire accessories. |
|
|
|
|
|
INSULATORS. |
|
|
|
|
a |
90KN Insulator
(taking 5% extra towards wastage) |
500No. |
|
|
|
b |
120 KN Insulator
(taking 5% extra towards wastage.) |
400Nos. |
|
|
|
11 |
Total cost
of the insulator. |
|
|
|
|
|
HARDWARE
FITTINGS. |
|
|
|
|
a |
Single suspension
Hardwares fittings AGS Type. |
30 Nos. |
|
|
|
b |
Double suspension
Hardware fittings AGS Type. |
12 Nos. |
|
|
|
c |
Single tension
Hardware fittings. |
12 Nos. |
|
|
|
d. |
Double tension
Hardware fittings. |
12 Nos. |
|
|
|
12 |
Total cost
of Hardware fittings. |
|
|
|
|
13 |
Supply of MS Templates for the
above type towers and their extentions of +3 mtrs and +6 mtrs as below
PA Type-1 Nos
PC Type-2 nos
|
0.8 MT |
|
|
|
|
Total Cost Rs |
|
|
|
|
(Annexure-II)
SCHEDULE OF QUANTITY FOR CONSTRUCTION OF LILO LINE ON DC TOWER
FROMASKA- CHHATRAPUR 132 KV LINE
SL No |
DESCRIPTION OF WORK |
Unit |
|
Unit rate in
Rs. |
Amount in Rs. |
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
1 |
Check Survey
and detailed survey including taking level, profile plotting, tower
spotting, foundation marking, showing position of road, power line river
crossing etc as per specification including supply of all T&P, labour and as
per instruction of engineer in charge. |
Km. |
2.5 |
|
|
2 |
Excavation
and back filling ( back filling shall be done in layers of 500 mm with
sprinkling of water ramming and shifting the excess soil outside) as per
technical specification including supply of all labour, T&P and as per
direction of engineer in charge. |
|
|
|
|
|
- Ordinary/
Normal soil/Soft/ loose Soil
|
Cum |
110 |
|
|
|
- Wet soil/
submerged soil
|
Cum |
68 |
|
|
|
- Compact
and dense Soil
|
Cum |
30 |
|
|
|
- Soft Rock
|
Cum |
18 |
|
|
|
- Hard Rock
|
Cum |
9 |
|
|
3 |
Supply of all
materials,Shoring and shuttering required for Wet locations using shuttering
plates only including supply of all labour, T&P and as per instruction of
engineer in charge. |
Sqr.Mtr |
820 |
|
|
4 |
De watering
including supply of electric motor/ diesel motor, fuel, lubricants, motor
operator all labour, T&P, supply of own generator where necessary and as per
instruction of engineer in charge. |
|
|
|
|
|
HP Hours |
Hours |
20 |
|
|
5 |
Fixing of
template and setting of stubs as per drawing including all T&P, labour and
as per instruction of engineer in charge. |
MT |
|
|
|
|
PA Type |
Nos |
7 |
|
|
|
PC Type |
Nos |
3 |
|
|
6. |
For shallow
foundation (opencast) work.
Providing and
laying ordinary plane reinforcement concrete work of grade M-150(1:2:4) with
approved quality stone chips of nominal size 12mm to 20 mm in tower
foundation and coping inclusive of cost of mixing, supply of form boxes
laying, curing, testing of sample cubes etc. with supply of cement ,
reinforcement steel rods ,all labour and T&P conforming to relevant IS. The
cooping height should be 350mm above the ground level. The surrounding area
should be clear from deposited materials and damage of the land if any
should be repaired before taking final measurement.
(1)Cement
Ratio 1 :2:4
(2)1:1.5:3
(3)1:3:6
|
Cum
Cum
Cum |
140
5
5
|
|
|
7 |
Hoisting &
fixing of insulators with required accessories, paying out position,
stringing, sagging etc, of power conductor (ACSR panther 6 nos. conductors)
and earth wire (one earth wire) with all required accessories including
scaffolding for EHT, HT, LT & P&T lines, railway crossing and using own
required T&P and compression jointing machine, all labour etc. |
Route/ Km. |
2.5 |
|
|
8 |
Erection of
Towers: Erection of tower supper-structure complete with tightening &
punching of bolts including fixing and punching of step-bolts. All the left
out portion of the bolts above bottom cross arm should be riveted by using
suitable hammer. Supply & painting of structure by black bituminous paints(
3 coats should to be provided) up to a height of 500 mm above the cooping.
(Both the leg and bracing members to be painted). Including supply of all
labour and T&P
|
MT
|
40.457 |
|
|
9 |
Excavation in
all type of soil including rock of size 800 mm x 800 mm x 3000 mm, supply of
50 Kg common salt, 50 KG of charcoal, or coke in alternate layer after
putting the earthing device, supply and putting required amount of foreign
soil including supply of all labour and T&Pand HEAVY DUTY 50 mm dia, 3050 mm
length TATA/JINDAL make GI Pipe earth elecvtrodes, supply, putting under
grounda50 X 6 mm GI Flat of adequate length and connecting to tower and the
electrode.
|
Nos. |
10 |
|
|
10 |
Fixing of
Tower Accessories such as Number Plate, danger Plate, Phase Plate etc
including supply of all labour and T&P etc. |
No. |
10 |
|
|
11 |
Fixing of
anticlimbing device. |
No. |
10 |
|
|
12 |
Welding of
Bolts & Nuts (continuous welding surround the bolts & nuts) upto peak except
cross arm including supply of diesel welding generator, welding rods ,all
T&P, fuel and lubricants and all labour. |
Nos. |
4500 |
|
|
|
Total |
|
|
|
|
(Annexure-III)
SCHEDULE OF QUANTITY FOR PURUSOTTAMPUR 132 KV/33KV GRID
LIST OF MATERIALS/EQUIPMENT REQUIRED FOR CONSTRUCTION OF 2X 12.5 MVA 132KV /33 KV GRID SUB-
STATION (5 NOS. 132V BAYS AND 7 NOS.33KV BAYS) AT PURUSOTTAMPUR
Sl.
No. |
Description of materials. |
Qty. to be supplied.
|
SUPPLY |
Installation & commissioning. |
Gr total
(Rs.) |
(A) |
132 KV side. |
|
Unit Ex- works. |
Ex- works price. |
Taxes & Duties. |
Frt. & Ins. |
FOR desti. |
Unit price. |
Total price. |
1. |
Making RCC foundation for
the 12.5 MVA,132 KV/33KV transformers including supply of all materials as
per technical specification,(Except Transformer) including making of RCC oil
collection pit and soak pits as per standard practice, Supply and
installation of pump for the excavation of rain water from soak pit
withoutlet PVC pipeing arrangemt with 100 mm 80 schedule PVC Pipe, Supply
and fixing of 250 mm RCC hume pipe, RSS Joist.Buffle wall shall be
constructed for separation of oil and water.,Supply and fixation of rail for
the transformer as per site requirement , making concrete platform in the
transformer plinth area. Receiving the the 20 MVA,132 KV/33 KV Transformer
with all accessaries from the nearest OPTCL store , dragging, to plinth.
Placing in position, erection, testing and commissioning the same as per
the irection of the engineer in charge with filtration of transformer oil . |
2 Nos.
|
|
|
|
|
|
|
|
|
2. |
Supply, erection, testing and commissioning of 132 KV
SF-6 Breaker including foundation as per the technical specification
including GI Structurals for 132KV SF_ 6 Breaker and as per the
direction of the engineer in charge. |
5 sets. |
|
|
|
|
|
|
|
|
3. |
Supply, erection, testing and commissioning of 132 KV
SI, including foundation and GI structurals as per the technical
specification and direction of engineer in charge for 132KV SI without E/S. |
8 set. |
|
|
|
|
|
|
|
|
4. |
Supply, erection, testing and commissioning of 132 KV
D/I without E/S including foundation and GI structurals as per the technical
specification 132KV SI without E/S. |
2 sets. |
|
|
|
|
|
|
|
|
5 |
Supply, erection, testing and commissioning of 132 KV
S/I with E/S Beam mounted type |
2 Sets |
|
|
|
|
|
|
|
|
6 |
Supply, erection, testing and commissioning of 132 KV
D/I with E/S including foundation and GI structurals as per the technical
specification 132KV DI with E/S. |
2 Sets |
|
|
|
|
|
|
|
|
7 |
Supply, erection, testing and commissioning including
making foundation and supply of GI structurals as per the technical
specification the following 145KV CT (1 phase)
A)For Feeder-6 Nos
B)For Transformer-6 Nos
C) For bus coupler-3 Nos |
15 Nos. |
|
|
|
|
|
|
|
|
8. |
Supply, erection, testing and commissioning of
including foundation and GI structurals as per the technical specification
the following 120 KV LAs
a)
For feeder-6 Nos
b)
For transformer-6 Nos |
12 Nos. |
|
|
|
|
|
|
|
|
9. |
Supply, erection, testing and commissioning including
making foundation for the 132 KV Duplex type CR Panel (TRANSFORMERS) as per
specification with supply and fabrication of 100mmX50 mm Channel for CR
Panel base with 100X116 mm RS Joiststand and 6.0 mm thickchequered plate
plat form for inner passage, 45mmX45MMx5 mmMS Angles for floors, 150 mm 80
schedule PVC Pipes for cables from cable trencg to respective CR including
supply of all materials, labour and T&P . |
2 No. |
|
|
|
|
|
|
|
|
10. |
Supply, erection, testing and commissioning including
making foundation for the 132 KV Duplex type CR Panel (FEEDERS) as per
specification with supply and fabrication of 100mmX50 mm Channel for CR
Panelbase with 100X116 mm RS Joiststand and 6.0 mm thickchequered plate plat
form for inner passage, 45mmX45MMx5 mmMS Angles for floors, 150 mm 80
schedule PVC Pipes for cables from cable trencg to respective CR including
supply of all materials, labour and T&P .( Firms may also quote for RACK
Type Panels) |
|
|
|
|
|
|
|
|
|
11. |
Supply, erection, testing and commissioning including
making foundation for the 132 KV Duplex type CR Panel (BUSCOUPLERS) as per
specification with supply and fabrication of 100mmX50 mm Channel for CR
Panelbase with 100X116 mm RS Joiststand and 6.0 mm thickchequered plate plat
form for inner passage, 45mmX45MMx5 mmMS Angles for floors, 150 mm 80
schedule PVC Pipes for cables from cable trencg to respective CR including
supply of all materials, labour and T&P . |
1 No. |
|
|
|
|
|
|
|
|
12. |
Supply, erection, testing and commissioning including
foundation and GI structurals for the 132 KV PT as per the technical
specification. (1 phase) |
1 sets
(3 Nos). |
|
|
|
|
|
|
|
|
13. |
Supply, erection, testing and commissioning of as per
the technical specification the 132 KV Tension insulators strings with 160
KN, Antifog type Zinc sleeve insulators and H.W. Fittings for ACSR Zebra
Conductor. |
66 sets. |
|
|
|
|
|
|
|
|
14. |
Supply, erection, testing and commissioning of 132 KV
suspension insulators strings with 120 KN Antifog type Zinc sleeve
insulators with H.W. fittings for ACSR Zebra conductor. |
12sets. |
|
|
|
|
|
|
|
|
15. |
Supply, erection, testing and commissioning of 160 KN
Insulator. As per technical specification. |
50 Nos. |
|
|
|
|
|
|
|
|
16. |
Supply, erection, testing and commissioning of 90 KN
Insulator as per technical specification. |
50 Nos. |
|
|
|
|
|
|
|
|
17. |
Supply, erection, testing and commissioning of
including supply of GI structurals, making foundation as per the technical
specification the 132 KV P.I. |
15 Nos. |
|
|
|
|
|
|
|
|
18 |
Supply, erection, testing and commissioning of 220 V
350 AH Plante type battery including all accessories with making of
foundation. |
2 Sets |
|
|
|
|
|
|
|
|
17 |
Supply, erection, testing and commissioning of 220 V
350 AH Charger including foundation as per the technical specification for
the above battery. |
2 Sets |
|
|
|
|
|
|
|
|
19 |
Supply, erection,termination, testing and commissioning
of the following sizes of unarmoured copper control cables including supply
of cable markers, ferrules, lugs, glands and termination of the cables
(a)2.5 Sq .mmX4 Core
(b)2.5 Sq.mmX10 Core
©2.5 Sq.mmX16 Core |
15 KM
12 KM
8 KM
|
|
|
|
|
|
|
|
|
20 |
Supply, erection,termination, testing and commissioning
of the following sizes of armoured PVC insulated Aluminum Power cables
including supply of cable markers, Sockets, glands and termination of the
cables for the LT Power supply arrangement.
(a)3.5X 300 Sq mm
(b)3.5X150 Sq.mm
©3.5X 50 Sq.mm
(d)4X25 Sq mm
(e)4X16 Sq mm
|
300 mtrs
200 mtrs
200 mtrs
400 mtrs
1000 mtrs |
|
|
|
|
|
|
|
|
21 |
Supply and fixing of all accessories like heavy duty GI
cable racks, trays, conduits, bends, junction boxes etc. for the entire
switch yard cabling and other work.. |
Lots as required |
|
|
|
|
|
|
|
|
22 |
Supply of all materials, design of earth grid for the
optimum capacity of the Sub- Station, earth mat, earthing system of the
switch yard , erection with Extending the earthing to all equipment, panels
by using adequate size of GI strips. The minimum earth mat conductor shall
be 75X 8 mm GI flat and the maximum spacing shall be 5000 mm beteen the GI
flats both in vertical and horizontal direction. |
Lots |
|
|
|
|
|
|
|
|
23 |
Designing the Complete switchyard lighting system of
the switch yard including supply of all labour and materials for a lux level
of 240 lux. |
Lots |
|
|
|
|
|
|
|
|
24 |
Designing the Complete road lighting system of the
Sub-Station including supply of all labour and all materials for a lux level
of 240 lux. |
Lots |
|
|
|
|
|
|
|
|
25 |
Designing and executin the complete Lightning
Protection of the switch yard with supply of all labour, materials like
spikes, risers, Shield wires, clamps, connectors ,earth electrodes, GI flats
of adequate size etc. |
Lots |
|
|
|
|
|
|
|
|
26 |
Bus Bar Stringing including supply of all materials and
labour, With ACSR Zebra conductors, clamps, insulators, Hard wares as per
specification and the direction of the engineer in charge. |
Lots |
|
|
|
|
|
|
|
|
27 |
Supply, Erection, testing and commissioning of the
adequate size DCDB as per technical specification. |
1 No |
|
|
|
|
|
|
|
|
28 |
Supply, Erection, testing and commissioning of the
adequate size ACDB as per technical specification |
2 No |
|
|
|
|
|
|
|
|
29 |
Supply and installation of complete fire fighting
system of the switchyard as per the fire safty Rules with due approval from
fire authority. |
Lots |
|
|
|
|
|
|
|
|
30 |
Supply of all materials, conductor, clamps, connectors
and hardwares and jumpering to all equipment, switch -gears and the bus bar
as per actual requirement for the 132 KV side Sub-Station. |
Lots |
|
|
|
|
|
|
|
|
31 |
Supply, erection, testing and commissioning of 132 KV
CVT including GI structural and making foundation as per the technical
specification for the CVT. |
3 Nos |
|
|
|
|
|
|
|
|
32 |
Supply, erection, testing and commissioning of 132 KV
wave Trap including GI structural and making foundation as per the
technical specification for the 132KV Wave Trap. |
2 Nos |
|
|
|
|
|
|
|
|
33 |
Supply, laying , testing and commissioning of coaxial
cables as per specification for the PLCC arrangement at Purusottampur
including supply of heavy gauge PVC pipes, clamps , shaddles for laying of
the cable |
500 mts |
|
|
|
|
|
|
|
|
34 |
Preparation of the Cable Schedule of the entire Grid
Substation |
Lots |
|
|
|
|
|
|
|
|
35 |
Supply, erection, testing and commissioning of 132 KV
NCT including GI structural and making foundation as per the technical
specification and requirement of REF Protection |
2 Nos |
|
|
|
|
|
|
|
|
(B) |
33KV side of 2X20MVA,132 KV/33 KV Switchyard. |
|
|
|
|
|
|
|
|
|
1. |
Supply, erection, testing and commissioning of 36 KV
VCB including GI structural and making foundation as per the technical
specification for the 33KV Circuit breaker (VCB) |
8 sets. |
|
|
|
|
|
|
|
|
2. |
Supply, erection, testing and commissioning, including
foundation as per the technical specification Supply of 33 KV/0.433KV, 250
KVA Stn. Transformer, with LT cable end box, ,DP Structure made out of 200X
100 mm RS Joist Pole of 11 mtr length with all bracing members of adequate
sizes, , Supply including foundation for 800 A, 50KA,4 Pole ACB of
electrically operated draw out type with micro proceesor controp,LT out door
Kiosk made out of 14 SWG CR Sheet , duly acid treated, painted as per
technical specification, supply of all conductor, clamps and jumpering of
33 KV,400 A, AB switch, 33 KV, 200 A, HG Fuse, 30 KV LA incomplete shape
with painting of Structures including supply of all materials, labour and
T&P. |
1 Set |
|
|
|
|
|
|
|
|
3. |
Supply, erection, testing and commissioning of 33 KV SI
including supply of GI structurals, making of foundation as per the
technical specification for the 33KV SI without E/S. |
10 Sets. |
|
|
|
|
|
|
|
|
4. |
Supply, erection, testing and commissioning including
supply of GI Structurals, Double Isolator, Making foundation as per the
technical specification of 33KV D/I without E/S |
2set. |
|
|
|
|
|
|
|
|
5 |
Supply, erection, testing and commissioning including
supply of GI Structurals,33 KV Double Isolator with E/S, Making foundation
as per the technical specification of 33KV D/I with E/S |
5 Setrs |
|
|
|
|
|
|
|
|
6. |
Supply, erection, testing and commissioning the 33KV
S.I. (Beam Mounted) as per technical specification |
2 sets. |
|
|
|
|
|
|
|
|
7. |
Supply, erection, testing and commissioning including
supply of GI Structurals the, 33KV CT, making foundation as per the
technical specification 33 KV CT (1 phase) 800/400/200/1-1-1-1A |
24 Nos. |
|
|
|
|
|
|
|
|
8. |
Supply, erection, testing and commissioning including
supply of GI Structurals the, 33KV NCT, making foundation as per the
technical specification 33 KV NCT (1 phase) 800/400/200/1-1-1-1A |
2 Nos |
|
|
|
|
|
|
|
|
9. |
Supply, erection, testing and commissioning of 33 KV LA
including supply of GI Structurals, foundation as per the technical
specification 33 KV LA (1 phase) |
24 nos. |
|
|
|
|
|
|
|
|
10. |
Supply, erection, testing and commissioning of 33 KV
PT, including supply of GI Structurals foundation as per the technical
specification of 33 KV PT (! Phase) |
3 nos. |
|
|
|
|
|
|
|
|
11. |
Supply, erection, testing and commissioning of 33 KV
feeder CR Panel, including making of foundation as per the technical
specification CR Panel (feeder) with supply and making of 100mmX50 mm
channel for each pannel base frame over the cable trench, with supply of
100 mm dia PVC Pipes of suitable length for the cable alley including supply
of all materials, labour and T&P |
5 sets. |
|
|
|
|
|
|
|
|
12. |
Supply, erection, testing and commissioning of 33 KV
Bus coupler CR Panel, including making of foundation as per the technical
specification CR Panel (Bus coupler) with supply and making of 100mmX50 mm
channel for each pannel base frame over the cable trench, with supply of
100 mm dia PVC Pipes of suitable length for the cable alley including supply
of all materials, labour and T&P |
1 set. |
|
|
|
|
|
|
|
|
13. |
Supply, erection, testing and commissioning of 33 KV
Transformer CR Panel, including making of foundation as per the technical
specification CR Panel (Transformer) with supply and making of 100mmX50 mm
channel for each pannel base frame over the cable trench, with supply of
100 mm dia PVC Pipes of suitable length for the cable alley including supply
of all materials, labour and T&P |
2 set. |
|
|
|
|
|
|
|
|
14. |
Supply, erection, testing and commissioning of all
clamps and connectors, conductors, jumpering to all equipment for the 33 KV
side of the Sub-Station . |
Lots |
|
|
|
|
|
|
|
|
15. |
Supply, erection, testing and commissioning of
including foundation as per the technical specification 33 KV PI Stack. |
15 sets |
|
|
|
|
|
|
|
|
16. |
Supply, erection, testing and commissioning Tension
H/W fittings for ACSR Panthor and 120 KN Antifog type Disc insulator as per
the technical specification for the bus bar arrangement . |
38sets. |
|
|
|
|
|
|
|
|
17. |
Supply, erection, testing and commissioning as per the
technical specification Suspension H/W fittings for ACSR Zebra including 90
KN Antifog type Disc insulatos with hard wares for the take off arrangement
. |
20 sets. |
|
|
|
|
|
|
|
|
18 |
Supply and laying, binding,ferruling, terminating as
per cable schedule the following o unarmoured control cables as per
technical specification including supply of all ferrules, all glands, lugs,
all labour and T&P.
a)2.5 Sq.mmX4 Core
b)2.5 Sq.mmX10 Core
c)2.5 Sq.mmx16 Core |
10.0 Km.
10.0 Km
6.0 Km
|
|
|
|
|
|
|
|
|
19 |
Switch Yard sand filling including supply of clear
river sand, all labour and T&P to maintain the R.L as per site requirement
and as per the direction of the engineer in charge.
|
10000 Cum |
|
|
|
|
|
|
|
|
20 |
HG Metal spreading including supply of 40 mm uniform
machine broken HG metal in a thickness of 150 mm with supply of all labour
and T&P in side the entire S/S i.e 132 KV and 33 KV Switchyard area. |
Lots as required |
|
|
|
|
|
|
|
|
21 |
Supply, Erection, testing and commissioning of CT ad PT
out door type console boxes/ bay marshalling boxes made out of 3.0 mm CR
Sheets with internal arrangement of TBs , all glands for cable entry
Including making of foundations. |
Lots |
|
|
|
|
. |
|
|
|
22 |
Deposit of all Statuary Fees, liaisoning and Getting
clearance from the statuary authority and other expenditures if any. |
Lots |
|
|
|
|
|
|
|
|
23 |
Anti weed and anti termite treatment of the entire
Substation area as per standard practice and as per the recommandation of
the chemical manufacturers including the switchyard with supply of good
quality of chemicals( Quality to be approved by OPTCL all labour and T&P. |
Entire S/S area |
|
|
|
|
|
|
|
|
24 |
Supply of all labour, T&P, 2 HP Submersible pump of
Texmo/Crompton/Kirloskar Water pump, Boaring of a new bore well of suitable
depth as per the site condition and approval of OPTCL, making water supply
arranement to the control room,staff quarters, Switch yard etc including
supply of all pipes of required sizes(G.I heavy duty ), good quality ISI
markrd taps and accessories etc. |
1Set |
|
|
|
|
|
|
|
|
25 |
Supply of all doors, Windows and Construction of a
suitable store shed and of size 15mX6m and of 4m height with RCC roof
slabs,flooring , electrification inconcealed manner, wiring for 4 nos 40 W
box type fluorescent fittings, two nos 1200 mm sweep fans , two nos 15 A
power plug points including supply of two nos 1200 mm sweep ceiling fans
and 4 nos 40 W Box type light fittings putting and wiring to 4 nos 15 A
power plug points and 4 nos 5 A Power plug points, Supply, fixing and
wiring to 1 no of exhaust fan with louver etc same as that of the control
room., |
1Set |
|
|
|
|
|
|
|
|
26 |
Supply of all materials ,T&P, Labour, Designing and
making control cable and power cable trench of the entire switch yard and
control room as per requirement as follows in RCC in the ratio 1:2:4 with
supply of all cement , All Steel, binding wire all coarse and fine
aggregates as per requirement with supply and fixing of top RCC Cover Slab
of 75 mm thick.
600 mmX900 mm size with150 mm thick RCC Wall and 150 mm
base slab including supply of all materials, labour and T&P.
|
|
|
|
|
|
|
|
|
|
|
(a)600 mmX600mm of 200 mm thick wall(Double side)
(b) 450 mmX450mm of 200 mm thick wall(Double side)
|
200 Mtrs
4500 Mtrs |
|
|
|
|
|
|
|
|
27 |
Supply of all materials ,T&P, Labour, Designing entire
fencing of the Sub Station with brick retaining wall, all GI 100 mmX 50 mm
fencing post channels, GI Goat mesh of 6 SWG Hot Dip chain link fencing
with 50X5 mm GI Flat welded in 3 rows welded back to back in both side or
bolted with GI Chanel by providing 10 mm dia GI Bolts and nuts. as per
requirement including execution, making foundation in RCC in the ratio 1:2:4
with supply of all cement , Steel, all channels , all goat mesh all coarse
and fine aggregates and supply and putting of two nos of gates at different
locations as per the direction of the engineer in charge . |
Lots |
|
|
|
|
|
|
|
|
28 |
Designing and
providing 2 T Capacity split type A.C machines in the control room including
supply of all other accessories required. The AC should be of LG, Blue star,
Volta or Siemens Make with provision of branded Stabiliser including supply
of all materials, labour and T&P. |
6 nos |
|
|
|
|
|
|
|
|
29 |
|
Lots |
|
|
|
|
|
|
|
|
30 |
Supply of adequate nos of HT Grade Rubber Mats, First
aid boxes, shock treatment chart, artificial respirators for the control
room and the sub-station including supply and fixing of all materials,
labour and T&P. |
lots |
|
|
|
|
|
|
|
|
31 |
Supply , erection of the main and wicked gate for the
Sub- Station including making of the concrete pillars for the Gates.
|
1 No+1 No |
|
|
|
|
|
|
|
|
32 |
Deposit of all statutary fees, getting clearance from
the electricl inspector for both Sub-station and line |
lots |
|
|
|
|
|
|
|
|
33 |
Supply and putting of executive type tables and chairs
of Godrej make as below for the control room.
(a)
Executive table-1 No
(b)
Executive chairs-8 nos |
|
|
|
|
|
|
|
|
|
34 |
Supply , erection, testing and commissioning of 48V,300
AH Plante Type battery and Suitable Charger as per specification of battery
and Charger for the PLCC System at Purusottampur |
1 Set |
|
|
|
|
|
|
|
|
35 |
Supply and plantation of 200 nos of fruit bearing and
decorative plants inside the switchyard as per requirement and instruction
of the engineer in charge including making fencing arrangement. The work
shall be takenup immediately after takenover of the Sub- Station Site by the
contractor. |
Lot |
|
|
|
|
|
|
|
|
36 |
Excavation of Sub- Station area in all type soil
including rock |
400 Cum |
|
|
|
|
|
|
|
|
37 |
Supply of all materials ,T&P, Labour and making the
sub- Station area PCC of ratio1:4:8 using 30 mm HG metals as per the
direction of the engineer in charge. |
100 Cum |
|
|
|
|
|
|
|
|
|
TOTAL Rs. |
|
|
|
|
|
|
|
|
|
(Annexure-IV)
SCHEDULE OF QUANTITY FOR PURUSOTTAMPUR 132 KV/33KV GRID
BILL OF QUANTITIES OF TOWER MATERIALS, EQUIPMENT STRUCTURALS TO
BE SUPPLIED BY THE CONTRACTOR
FOR THE PURUSOTTAMPUR 12.5 MVA,132 KV/33 KV SUBSTATION WORK.
Sl.
No. |
Description of the material |
UNIT |
SUPPLY |
Installation and commissioning |
Grand
Total Rs. |
Unit Ex.
Works |
Total Exworks |
Taxes and
duties |
Frt. & Ins. |
FOR
Destination |
Unit Price |
Total Price |
1 |
Galvanised tower
structurals supply and erection including foundation as per instruction of
engineer in charge and technical specification including supply of all
materials, consumables, sundries, all GI Bolts Nuts, washers, etc |
|
|
|
|
|
|
|
|
|
A |
132 KV columns |
|
|
|
|
|
|
|
|
|
|
a)T1S, 15.0 mtr high column with
peak and spike |
16
Nos(19.088 MT) |
|
|
|
|
|
|
|
|
|
b) T4S, 11.0 mtr high column with
peak and spike |
7 Nos(6.468
MT) |
|
|
|
|
|
|
|
|
B |
GALVANISED 132 KV BEAMS |
|
|
|
|
|
|
|
|
|
|
a)G-1 Type10.4.0 mtr long with all
bracing members as per drawing |
13 Nos(7.969
MT) |
|
|
|
|
|
|
|
|
|
b) G-2 Type 14.9875 Mtr long
withal bracing |
4
Nos(3.624MT) |
|
|
|
|
|
|
|
|
|
c)G1X Type 10.4 mtr long with all
bracings |
2 Nos(1.370
MT) |
|
|
|
|
|
|
|
|
C |
33KV COLUMNS |
|
|
|
|
|
|
|
|
|
|
a)T-8S Type, 8.5+2.0 mtr high
with peak and spike. |
9 Nos |
|
|
|
|
|
|
|
|
|
b) T-9S Type 5.5+2.0 mtr high with
peak and spike |
11Nos |
|
|
|
|
|
|
|
|
D |
33KV BEAMS |
|
|
|
|
|
|
|
|
|
|
a) G-4 type 5.5 mtr long with all
bracings |
9 Nos |
|
|
|
|
|
|
|
|
|
b) G-4X type 5.5 mtr long with all
bracings |
2 Nos |
|
|
|
|
|
|
|
|
|
c)G-6 type 7.25 mtr long with all
bracings |
3 Nos |
|
|
|
|
|
|
|
|
|
Total Cost Rs. |
|
|
|
|
|
|
|
|
|
(Civil works for Purusottampur
placed at the end of the price schedule which the firm has to
quote along with putusottampur price)
PACKAGE-III
CONSTRUCTION OF 20 MVA,220 KV/33 KV
TRANSFORMER BAYS AT MENDHASAL
PACKAGE-3
SCHEDULE OF QUANTITIES FOR MENDHASAL 20
MVA,220 KV/33 KV TRANSFORMER BAY EXTENTION WORK
ANNEXURE-I
SCHEDULE OF QUANTITY FOR MENDHASAL, 20 MVA,
220 KV/33KV TRANSFORMER BAYS
LIST OF MATERIALS/EQUIPMENT REQUIRED FOR CONSTRUCTION OF 20 MVA
220KV /33 KV TRANSFORMER BAYS AT MENDHASAL
Sl.
No. |
Description
of materials. |
Qty. to be
supplied. |
SUPPLY |
Installation
& commissioning. |
Grand total
(Rs.) |
(A) |
132 KV
side. |
|
Unit
Ex-works. |
Ex-works
price. |
Taxes &
Duties. |
Frt. & Ins. |
FOR
destination |
Unit price. |
Total price. |
1. |
Making RCC foundation for the 20
MVA,220 KV/33KV transformers including supply of all materials as per
technical specification,(Except Transformer) including making of RCC oil
collection pit and soak pits as per standard practice, Supply and
installation of pump for the excavation of rain waterfrom soak pit
withoutlet PVC pipeing arrangemt with 100 mm 80 schedule PVC Pipe, Supply
and fixing of 250 mm RCC hume pipe, RSS Joist.Buffle wall shall be
constructed for separation of oil and water.,Supply and fixation of rail for
the transformer as per site requirement , making concrete platform in the
transformer plinth area. Receiving the the 20 MVA,220 KV/33 KV Transformer
with all accessaries from the nearest OPTCL store , dragging, to plinth.
Placing in position, erection, testing and commissioning the same as per
the irection of the engineer in charge with filtration of transformer oil .
|
1 Nos.
|
|
|
|
|
|
|
|
|
2. |
Supply,
erection, testing and commissioning of 220 KV SF-6 Breaker including
foundation as per the technical specification including GI Structurals for
132KV SF_ 6 Breaker and as per the direction of the engineer in
charge. |
1 sets. |
|
|
|
|
|
|
|
|
3. |
Supply,
erection, testing and commissioning of 220 KV SI, including foundation and
GI structurals as per the technical specification and direction of engineer
in charge for 132KV SI without E/S. |
3 set. |
|
|
|
|
|
|
|
|
4. |
Supply,
erection, testing and commissioning of 220 KV S/I with E/S including
foundation and GI structurals as per the technical specification 132KV SI
with E/S. |
1 sets. |
|
|
|
|
|
|
|
|
5 |
Supply,
erection, testing and commissioning of 220 KV Tandom Isolator with all
accessories and the mounting arrangement s etc |
2 Sets |
|
|
|
|
|
|
|
|
6 |
Supply,
erection, testing and commissioning including making foundation and supply
of GI structurals as per the technical specification the following 245KV CT
(1 phase)
A)For
Transformer-6 Nos
|
3 Nos. |
|
|
|
|
|
|
|
|
7. |
Supply,
erection, testing and commissioning of including foundation and GI
structurals as per the technical specification the following 216 KV LAs
a)For transformer-6 Nos |
3 Nos. |
|
|
|
|
|
|
|
|
8 |
Supply,
erection, testing and commissioning including making foundation for the 220
KV Duplex type CR Panel (TRANSFORMERS) as per specification with supply and
fabrication of 100mmX50 mm Channel for CR Panel base with 100X116 mm RS
Joiststand and 6.0 mm thickchequered plate plat form for inner passage,
45mmX45MMx5 mm MS Angles for floors, 150 mm 80 schedule PVC Pipes for cables
from cable trencg to respective CR including supply of all materials, labour
and T&P .The control and relay system should be compatible to the existing
system of the Grid to match the bus bar differential protection sustem and
autyomation sysytem of the Transformer. The contractor has to visit the site
and see the existing system and shall have to provide the relays as per
above. |
1 No. |
|
|
|
|
|
|
|
|
9. |
Supply,
erection, testing and commissioning of as per the technical specification
the 220 KV Tension insulators strings with 160 KN, Antifog type Zinc sleeve
insulators and H.W. Fittings for ACSR Zebra Conductor. |
60 sets. |
|
|
|
|
|
|
|
|
10. |
Supply,
erection, testing and commissioning of 220 KV suspension insulators strings
with 160 KN Antifog type Zinc sleeve insulators with H.W. fittings for ACSR
Zebra conductor. |
30sets. |
|
|
|
|
|
|
|
|
11. |
Supply,
erection, testing and commissioning of including supply of GI structurals,
making foundation as per the technical specification the 220 KV P.I. |
16 Nos. |
|
|
|
|
|
|
|
|
12 |
Supply,
erection,termination, testing and commissioning of the following sizes of
unarmoured copper control cables including supply of cable markers,
ferrules, lugs, glands and termination of the cables
(a)2.5
Sq .mmX4 Core
(b)2.5 Sq.mmX10 Core
©2.5 Sq.mmX16 Core |
3 KM
2KM
1.5 KM
|
|
|
|
|
|
|
|
|
13 |
Supply,
erection,termination, testing and commissioning of the following sizes of
armoured PVC insulated Aluminum Power cables including supply of cable
markers, Sockets, glands and termination of the cables for the LT Power
supply arrangement.
(a)3.5X 300
Sq mm
(b)3.5X150
Sq.mm
©3.5X 50
Sq.mm
(d)4X25 Sq mm
(e)4X16 Sq mm
|
50 mtrs
50 mtrs
200 mtrs
200 mtrs
2000 mtrs |
|
|
|
|
|
|
|
|
14 |
Supply and
fixing of all accessories like heavy duty GI cable racks, trays, conduits,
bends, junction boxes etc. for the entire switch yard cabling and other
work.. |
Lots as
required |
|
|
|
|
|
|
|
|
15 |
Supply of all
materials, design of earth grid for the optimum capacity of the Sub-
Station, earth mat, earthing system of the switch yard , erection with
Extending the earthing to all equipment, panels by using adequate size of GI
strips. The minimum earth mat conductor shall be 75X 8 mm GI flat and the
maximum spacing shall be 5000 mm beteen the GI flats both in vertical and
horizontal direction. |
Lots |
|
|
|
|
|
|
|
|
16 |
Designing the
Complete switchyard lighting system of the switch yard including supply of
all labour and materials for a lux level of 240 lux. |
Lots |
|
|
|
|
|
|
|
|
17 |
Designing the
Complete road lighting system of the Sub-Station including supply of all
labour and all materials for a lux level of 240 lux. |
Lots |
|
|
|
|
|
|
|
|
18 |
Designing and
executin the complete Lightning Protection of the switch yard with supply of
all labour, materials like spikes, risers, Shield wires, clamps, connectors
,earth electrodes, GI flats of adequate size etc. |
Lots |
|
|
|
|
|
|
|
|
19 |
Double Bus
Bar Stringing including supply of all materials and labour, With ACSR
Moose conductors, clamps, insulators, Hard wares as per specification and
the direction of the engineer in charge for the 220 KV transformer bay.
|
Lots |
|
|
|
|
|
|
|
|
20 |
Supply and
installation of complete fire fighting system of the switchyard as per the
fire safty Rules with due approval from fire authority. |
Lots |
|
|
|
|
|
|
|
|
21 |
Supply of all
materials, conductor, clamps, connectors and hardwares and jumpering to all
equipment, switch -gears and the bus bar as per actual requirement for the
220 KV side Sub-Station. |
Lots |
|
|
|
|
|
|
|
|
22 |
Preparation
of the Cable Schedule of the entire 220 and 33 KV Transformer Bays |
Lots |
|
|
|
|
|
|
|
|
23
|
Supply,
erection, testing and commissioning of 220 KV NCT including GI structural
and making foundation as per the technical specification and requirement of
REF Protection |
1 Nos |
|
|
|
|
|
|
|
|
(B) |
33KV side
of 2X20MVA,220 KV/33 KV Switchyard. |
|
|
|
|
|
|
|
|
|
1. |
Supply,
erection, testing and commissioning of 36 KV VCB including GI structural and
making foundation as per the technical specification for the 33KV Circuit
breaker (VCB) |
4 sets. |
|
|
|
|
|
|
|
|
2. |
Supply,
erection, testing and commissioning of 33 KV SI including supply of GI
structurals, making of foundation as per the technical specification for
the 33KV SI without E/S. |
7 Sets. |
|
|
|
|
|
|
|
|
3 |
Supply,
erection, testing and commissioning including supply of GI Structurals,
Double Isolator, Making foundation as per the technical specification of
33KV D/I without E/S |
1set. |
|
|
|
|
|
|
|
|
4 |
Supply,
erection, testing and commissioning including supply of GI Structurals,33 KV
Double Isolator with E/S, Making foundation as per the technical
specification of 33KV D/I with E/S |
2 Sets |
|
|
|
|
|
|
|
|
5. |
Supply,
erection, testing and commissioning the 33KV S.I. (Beam Mounted) as per
technical specification |
2 sets. |
|
|
|
|
|
|
|
|
6. |
Supply,
erection, testing and commissioning including supply of GI Structurals the,
33KV CT, making foundation as per the technical specification 33 KV CT (1
phase) 800/400/200/1-1-1-1A |
12 Nos. |
|
|
|
|
|
|
|
|
7. |
Supply,
erection, testing and commissioning including supply of GI Structurals the,
33KV NCT, making foundation as per the technical specification 33 KV NCT (1
phase) 800/400/200/1-1-1-1A |
1 Nos |
|
|
|
|
|
|
|
|
8. |
Supply,
erection, testing and commissioning of 33 KV LA including supply of GI
Structurals, foundation as per the technical specification 33 KV LA (1
phase) |
9 nos. |
|
|
|
|
|
|
|
|
9. |
Supply,
erection, testing and commissioning of 33 KV PT, including supply of GI
Structurals foundation as per the technical specification of 33 KV PT (!
Phase) |
3 nos. |
|
|
|
|
|
|
|
|
10. |
Supply,
erection, testing and commissioning of 33 KV feeder CR Panel, including
making of foundation as per the technical specification CR Panel (feeder)
with supply and making of 100mmX50 mm channel for each pannel base frame
over the cable trench, with supply of 100 mm dia PVC Pipes of suitable
length for the cable alley including supply of all materials, labour and T&P |
2 sets. |
|
|
|
|
|
|
|
|
11. |
Supply,
erection, testing and commissioning of 33 KV Bus coupler CR Panel, including
making of foundation as per the technical specification CR Panel (Bus
coupler) with supply and making of 100mmX50 mm channel for each pannel base
frame over the cable trench, with supply of 100 mm dia PVC Pipes of suitable
length for the cable alley including supply of all materials, labour and T&P |
1 set. |
|
|
|
|
|
|
|
|
12. |
Supply,
erection, testing and commissioning of 33 KV Transformer CR Panel, including
making of foundation as per the technical specification CR Panel
(Transformer) with supply and making of 100mmX50 mm channel for each pannel
base frame over the cable trench, with supply of 100 mm dia PVC Pipes of
suitable length for the cable alley including supply of all materials,
labour and T&P |
1 set. |
|
|
|
|
|
|
|
|
13. |
Supply,
erection, testing and commissioning of all clamps and connectors,
conductors, jumpering to all equipment for the 33 KV side of the
Sub-Station . |
Lots |
|
|
|
|
|
|
|
|
14. |
Supply,
erection, testing and commissioning of including foundation as per the
technical specification 33 KV PI Stack. |
8 sets |
|
|
|
|
|
|
|
|
15. |
Supply,
erection, testing and commissioning Tension H/W fittings for ACSR Panthor
and 120 KN Antifog type Disc insulator as per the technical specification
for the bus bar arrangement . |
38sets. |
|
|
|
|
|
|
|
|
16. |
Supply,
erection, testing and commissioning as per the technical specification
Suspension H/W fittings for ACSR Zebra including 90 KN Antifog type Disc
insulatos with hard wares for the take off arrangement . |
20 sets. |
|
|
|
|
|
|
|
|
17
|
Supply and
laying, binding,ferruling, terminating as per cable schedule the following
o unarmoured control cables as per technical specification including supply
of all ferrules, all glands, lugs, all labour and T&P.
a)2.5 Sq.mmX4
Core
b)2.5
Sq.mmX10 Core
c)2.5
Sq.mmx16 Core |
6.0 Km.
4.0 Km
2.0 Km
|
|
|
|
|
|
|
|
|
18 |
Switch Yard
sand filling including supply of clear river sand, all labour and T&P to
maintain the R.L as per site requirement and as per the direction of the
engineer in charge.
|
5000 Cum |
|
|
|
|
|
|
|
|
19 |
HG Metal
spreading including supply of 40 mm uniform machine broken HG metal in a
thickness of 150 mm with supply of all labour and T&P in side the entire
S/S i.e 220 KV and 33 KV Transformer Bays. |
Lots as
required |
|
|
|
|
|
|
|
|
20 |
Supply,
Erection, testing and commissioning of CT ad PT out door type console boxes/
bay marshalling boxes made out of 3.0 mm CR Sheets with internal arrangement
of TBs , all glands for cable entry Including making of foundations. |
Lots as
required |
|
|
|
|
.
|
|
|
|
21 |
Deposit of
all Statuary Fees, liaisoning and Getting clearance from the statuary
authority and other expenditures if any. |
Lots |
|
|
|
|
|
|
|
|
22 |
Anti weed
and anti termite treatment of the entire Substation area as per standard
practice and as per the recommandation of the chemical manufacturers
including the switchyard with supply of good quality of chemicals( Quality
to be approved by OPTCL all labour and T&P. |
Entire S/S
area |
|
|
|
|
|
|
|
|
23 |
Supply of all
materials ,T&P, Labour, Designing and making control cable and power cable
trench of the entire switch yard and control room as per requirement as
follows in RCC in the ratio 1:2:4 with supply of all cement , All Steel,
binding wire all coarse and fine aggregates as per requirement with supply
and fixing of top RCC Cover Slab of 75 mm thick.
600 mmX900 mm
size with150 mm thick RCC Wall and 150 mm base slab including supply of all
materials, labour and T&P.
|
|
|
|
|
|
|
|
|
|
|
(a)600
mmX600mm of 200 mm thick wall(Double side)
(b) 450
mmX450mm of 200 mm thick wall(Double side)
|
100 Mtrs
1500 Mtrs |
|
|
|
|
|
|
|
|
24 |
Supply of all
materials ,T&P, Labour, Designing entire fencing of the Sub Station with
brick retaining wall, all GI 100 mmX 50 mm fencing post channels, GI Goat
mesh of 6 SWG Hot Dip chain link fencing with 50X5 mm GI Flat welded in 3
rows welded back to back in both side or bolted with GI Chanel by providing
10 mm dia GI Bolts and nuts. as per requirement including execution, making
foundation in RCC in the ratio 1:2:4 with supply of all cement , Steel, all
channels , all goat mesh all coarse and fine aggregates and supply and
putting of two nos of gates at different locations as per the direction of
the engineer in charge . |
Lots |
|
|
|
|
|
|
|
|
25 |
Supply of
adequate nos of HT Grade Rubber Mats, First aid boxes, shock treatment
chart, artificial respirators for the control room and the sub-station
including supply and fixing of all materials, labour and T&P. |
lots |
|
|
|
|
|
|
|
|
26 |
Deposit of
all statutary fees, getting clearance from the electricl inspector for
both Sub-station and line |
lots |
|
|
|
|
|
|
|
|
27 |
Excavation
of Sub- Station area in all type soil including rock |
40 Cum |
|
|
|
|
|
|
|
|
28 |
Supply of all
materials ,T&P, Labour and making the sub- Station area PCC of ratio1:4:8
using 30 mm HG metals as per the direction of the engineer in charge. |
40 Cum |
|
|
|
|
|
|
|
|
|
TOTAL Rs. |
|
|
|
|
|
|
|
|
|
Annexure--2
BILL OF QUANTITIES OF TOWER MATERIALS,
EQUIPMENT STRUCTURALS TO BE SUPPLIED BY THE CONTRACTOR FOR THE
MENDHASAL 220 KV/33 KV SUBSTATION WORK.
Sl.
No. |
Description of the material |
UNIT |
SUPPLY |
Installation and commissioning |
Grand
Total Rs. |
Unit Ex.
Works |
Total Exworks |
Taxes and
duties |
Frt. & Ins. |
FOR
Destination |
Unit Price |
Total Price |
1 |
Galvanised tower
structurals supply and erection including foundation as per instruction of
engineer in charge and technical specification including supply of all
materials, consumables, sundries, all GI Bolts Nuts, washers, etc |
|
|
|
|
|
|
|
|
|
A |
220 KV columns |
|
|
|
|
|
|
|
|
|
|
a)P1S, 21.5 mtr high column with
peak and spike |
5 Nos(each of
4.629 MT |
|
|
|
|
|
|
|
|
|
b) P2A, 11.0 mtr high column with
peak and spike |
4 Nos(each of
1.284 MT MT) |
|
|
|
|
|
|
|
|
B |
GALVANISED 220 KV BEAMS |
|
|
|
|
|
|
|
|
|
|
a)Q-1 Type 17.0 mtr long with all
bracing members as per drawing |
4Nos(each1.577 MT) |
|
|
|
|
|
|
|
|
|
b) Q-3 Type 21.5 Mtr long withal
bracing |
2Nos(each of
2.504 MT) |
|
|
|
|
|
|
|
|
|
c)Q4 Type 9 mtr long with all
bracings |
2 Nos(each
of 1.779 MT) |
|
|
|
|
|
|
|
|
C |
33KV COLUMNS |
|
|
|
|
|
|
|
|
|
|
a)T-8S Type, 8.5+2.0 mtr high
with peak and spike. |
9 Nos |
|
|
|
|
|
|
|
|
|
b) T-9S Type 5.5+2.0 mtr high with
peak and spike |
11Nos |
|
|
|
|
|
|
|
|
D |
33KV BEAMS |
|
|
|
|
|
|
|
|
|
|
a) G-4 type 5.5 mtr long with all
bracings |
9 Nos |
|
|
|
|
|
|
|
|
|
b) G-4X type 5.5 mtr long with all
bracings |
2 Nos |
|
|
|
|
|
|
|
|
|
c)G-6 type 7.25 mtr long with all
bracings |
3 Nos |
|
|
|
|
|
|
|
|
|
Total Rs |
|
|
|
|
|
|
|
|
|
PACKAGE-2
SCHEDULE OF
QUANTITIES FOR CONSTRUCTION OF 132 KV SC LINE IN DC TOWER FROM JAGATSINGHPUR TO PARADEEP WITH BAY EXTNNTION AT BOTH ENDS
PRICE SCHEDULE
(Annexure-I )
CONSTRUCTION OF 132 KV TRANSMISSION S/C LINE ON DC TOWER FROM
JAGATSINGHPUR GRID SUBSTATION TO PARADEEP GRID SUBSTATION
SUPPLY OF
TRANSMISSION LINE STRUCTURES
Sl.
No. |
Description. |
Unit weight.
MT
|
Quantity
MT/Nos/Sets/Km as the case may be |
Unit Rate
|
Amount.
Rs. |
(A) |
TOWER STRUCTURES. |
|
|
|
|
1. |
Lattice type Galvanized steel
tangent tower (PA type) with stubs and cleats. Sets.
(1)PA type-121 nos
(2)+3 mtr to PA-8 nos
(3)+6 mtr to PA-nIL |
3.247
0.611
1.298 |
392.887MT
4.888 MT
0
|
|
|
2. |
Lattice type galvanized steel 30
degree angle tower with stubs and cleats (PB type) Sets.
(1)PB-19 Nos
(2)+3 mtr to PB –4 NoS
|
4.952
0.975
|
94.008 MT
3.90MT
|
|
|
3 |
Lattice type galvanized steel 60
degree angle tower with sttrubs and cleats (PC type) Sets.
(1)PC type-7 Nos
(2)+6 mtr to
PC –1 Nos |
5.918
2.246
|
41.426MT
2.246MT
|
|
|
4. |
Lattice type galvanized steel 60
degree angle tower with sttrubs and cleats (UR- type Special towers) Sets.
(1)UR
type-2 Nos
(2)+6
mtr to UR –2 No
|
13.195
4.159 |
26.39 MT
8.318 MT |
|
|
5 |
TOTAL WEIGHT OF TOWER. |
574.067 MT |
|
|
|
|
The above line towers are
tenative and it may vary as per tower design of contractor and as per
actual site condition |
|
|
|
|
6 |
Supply of the total galvanized
Nuts & Bolts for the above towers of 16 mm dia as per specification of
different length as per the direction of the engineer in charge. |
35.0MT |
|
|
|
7 |
SUPPLY OF TOWER ACCESSORIES. |
|
|
|
|
a |
Earthing Device. |
151 Nos. |
|
|
|
b |
Danger Plate. |
149 Nos. |
|
|
|
c |
Number Plate. |
149 Nos. |
|
|
|
d |
Phase Plate. |
447 Nos. |
|
|
|
e |
Bird guard |
363 Nos. |
|
|
|
f |
Anti climbing device. |
149 Nos. |
|
|
|
|
|
|
|
|
|
8. |
Total cost of tower
fixture. |
|
|
|
|
|
POWER CONDUCTOR. |
|
|
|
|
a |
Total cost of the ACSR Panthor
Conductor. wth 5% provision for sag and wastage. |
177.0 Kms. |
|
|
|
|
CONDUCTOR ACCESSORIES. |
|
|
|
|
|
|
|
|
|
|
a |
Stock bridge VIB. Damper-Susp. LOC |
894 Nos. |
|
|
|
b |
Mid span compressor joints
|
190 Nos. |
|
|
|
e |
REPAIR SLEEVES @
ONE/ COND./ KM. |
190 Nos. |
|
|
|
9 |
Total cost
of conductor Accessories. |
|
|
|
|
|
EARTH WIRE: |
|
|
|
|
|
Total cost of earth
wire with 1.5% provision for SAG & Wastage. |
42.0 Kms. |
|
|
|
|
Earth wire
accessories. |
|
|
|
|
a |
Vibration Damper
(stock bridge type) |
300 Nos. |
|
|
|
b |
Flexible copper
Bonding pieces. |
190 Nos. |
|
|
|
c |
Suspension clamp. |
125 Nos. |
|
|
|
d |
Tension clamp. |
60 Nos. |
|
|
|
e |
Mid Span compressor
joint. |
60 Nos.
|
|
|
|
10 |
Total cost
of earth wire accessories. |
|
|
|
|
|
INSULATORS. |
|
|
|
|
a |
90KN Insulator
(taking 5% extra towards wastage) |
5100Nos. |
|
|
|
b |
120 KN Insulator
(taking 5% extra towards wastage.) |
3500Nos. |
|
|
|
11 |
Total cost
of the insulator. |
|
|
|
|
|
HARDWARE
FITTINGS. |
|
|
|
|
a |
Single suspension
Hardwares fittings AGS Type. |
330 Nos. |
|
|
|
b |
Double suspension
Hardware fittings AGS Type. |
147 Nos. |
|
|
|
c |
Single tension
Hardware fittings. |
195Nos. |
|
|
|
d. |
Double tension
Hardware fittings. |
90 Nos. |
|
|
|
e |
Hanger |
480 Nos |
|
|
|
f |
U-bolt |
145 Nos |
|
|
|
12 |
Total cost
of Hardware fittings. |
|
|
|
|
13 |
Supply of MS Templates for the
above type towers and their extentions of +3 mtrs and +6 mtrs as below
(a)
PA Type-8Nos
(b)
PB Type-4 nos
(c)
PC Type-4nos
(d)
UR+6 MTR type-1 no
|
57..4067 MT |
|
|
|
(ANNEXURE-II)
SCHEDULE OF QUANTITY FOR CONSTRUCTION OF 132 KV SC LINE ON DC
TOWER FROM JAGATSINGHPUR GRID SUB-STATION TO PARADEEP GRID
SUB-STATION.
SL No |
DESCRIPTION OF WORK |
Unit |
|
Unit rate in
Rs. |
Amount in Rs. |
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
1 |
Check Survey
and detailed survey including taking level, profile plotting, tower
spotting, foundation marking, showing position of road, power line river
crossing etc as per specification including supply of all T&P, labour and as
per instruction of engineer in charge including making of land scheduling. |
Km. |
57.0 |
|
|
2 |
Excavation
and back filling ( back filling shall be done in layers of 500 mm with
sprinkling of water ramming and shifting the excess soil outside) as per
technical specification including supply of all labour, T&P and as per
direction of engineer in charge. |
|
|
|
|
|
- Ordinary/
Normal soil/Soft/ loose Soil
|
Cum |
1302 |
|
|
|
- Wet soil/
submerged soil
|
Cum |
13024 |
|
|
|
- Compact
and dense Soil
|
Cum |
300 |
|
|
|
- Soft Rock
|
Cum |
180 |
|
|
|
- Hard Rock
|
Cum |
10 |
|
|
3 |
Supply of all
materials,Shoring and shuttering required for Wet locations using shuttering
plates only including supply of all labour, T&P and as per instruction of
engineer in charge. |
Sqr.Mtr |
17000 |
|
|
4 |
De watering
including supply of electric motor/ diesel motor, fuel, lubricants, motor
operator all labour, T&P, supply of own generator where necessary and as per
instruction of engineer in charge. |
|
|
|
|
|
Manually |
Hours |
400 |
|
|
|
HP Hours |
Hours |
17500 |
|
|
5 |
Fixing of
template and setting of stubs as per drawing including all T&P, labour and
as per instruction of engineer in charge. |
MT |
|
|
|
|
PA Type |
Nos |
121 |
|
|
|
PB Type |
Nos |
19 |
|
|
|
PC Type |
Nos |
7 |
|
|
|
URType |
Nos |
2 |
|
|
6. |
For shallow
foundation (opencast) work.
Providing and
laying ordinary plane reinforcement concrete work of grade M-150(1:2:4) with
approved quality stone chips of nominal size 12mm to 20 mm in tower
foundation and coping inclusive of cost of mixing, supply of form boxes
laying, curing, testing of sample cubes etc. with supply of cement , except
reinforcement steel rods ,all labour and T&P conforming to relevant IS. The
cooping height should be 350mm above the ground level. The surrounding area
should be clear from deposited materials and damage of the land if any
should be repaired before taking final measurement.
(1)Cement
Ratio 1 :2:4
(2)1:1.5:3
(3)1:3:6
|
Cum
Cum
Cum |
2100
20
15
|
|
|
7 |
Hoisting &
fixing of insulators with required accessories, paying out position,
stringing, sagging etc, of power conductor (ACSR panther 3 nos. conductors)
and earth wire (one earth wire) with all required accessories including
scaffolding for EHT, HT, LT & P&T lines, railway crossing and using own
required T&P and compression jointing machine, all labour etc.42 Km shall be
3 conductor and one earth wire nad balance 14 km shall be 3 conductor hot
line stringing. |
Route/ Km. |
56.063 |
|
|
8 |
Erection of
Towers: Erection of tower supper-structure complete with tightening &
punching of bolts including fixing and punching of step-bolts. All the left
out portion of the bolts above bottom cross arm should be riveted by using
suitable hammer. Supply & painting of structure by black bituminous paints(
3 coats should to be provided) up to a height of 500 mm above the cooping.
(Both the leg and bracing members to be painted). Including supply of all
labour and T&P
|
MT
|
663 |
|
|
9 |
Excavation in
all type of soil including rock of size 800 mm x 800 mm x 3000 mm, supply of
50 Kg common salt, 50 KG of charcoal, or coke in alternate layer after
putting the earthing device, supply and putting required amount of foreign
soil including supply of all labour and T&Pand HEAVY DUTY 50 mm dia, 3050 mm
length TATA/JINDAL make GI Pipe earth elecvtrodes, supply, putting under
grounda50 X 6 mm GI Flat of adequate length and connecting to tower and the
electrode.
|
Nos. |
149 |
|
|
10 |
Fixing of
Tower Accessories such as Number Plate, danger Plate, Phase Plate etc
including supply of all labour and T&P etc. |
No. |
149 |
|
|
11 |
Fixing of
anticlimbing device. |
No. |
149 |
|
|
12 |
Welding of
Bolts & Nuts (continuous welding surround the bolts & nuts) upto peak except
cross arm including supply of diesel welding generator, welding rods ,all
T&P, fuel and lubricants and all labour. |
Nos. |
160000 |
|
|
|
|
|
|
|
|
|
Piling work at two locations , 1 no PB type and 1 No-UR+6 type
|
|
|
|
|
I |
Soil exploration, testing for the pile locations and design of the piling
work for the foundations |
Nos |
23 |
|
|
2 |
Supply of all materials, T&P, labour as per technical specifications except
Steel rod and making under reamed pile boring of following diameter as per
the design in all type of soil as may be encountered in line the
instruction of the engineer in charge with betoniteshoring and stabilization
of the bore.
(a)375 mm dia
(b)500 mm dia
|
Mtr
Mtr |
1100
712 |
|
|
3 |
Suuply of all materials, labour and T&P, Excavation and back filling with
clear river sand as per the direction of the engineer in charge for the pile
capping work. |
Cum |
4000 |
|
|
4 |
Supply of all materials Concreting of M-20 (1:1.5:3) for the piling ,
caping , beam ,pedestal with supply of cement and excluding steel steel and
inclusive of all labour and T&P, all centering and shuttering materials and
as per the approved design . |
Cum |
745 |
|
|
5 |
Lean
concreting(1:3:6) as per specification with supply of cement and inclusive
supply of all other materials , labour and T&P |
Cum |
80 |
|
|
6 |
Supply of all materials , Centering and shuttering by good quality of sal
planks and beams as required and as per site condition including supply of
all labour and T&P |
Sq. mtr |
200 |
|
|
7
|
Supply, Cutting,
bending,hooking and binding in position MS bar for reinforcement of
foundation concrete for towers including supply of 18 SWG binding wire ,
all labour T&P etc as per site requirement and instruction of the engineer
in chargeSupply of steel as per design requirement Cutting, bending and
binding of different sizes of rods as per the design for Piles ,making cage,
for pile cap, for tie beam and for pedestal as per site requirement, welding
where required including supply of all T&P and labour and lowering the
cage . |
MT |
85 |
|
|
8 |
Supply of
random rubbles, cement, sand, HG Metal, HG Chips and all other materials for
doing the revetment, stone pitching as follows with supply of labour and T&P
(a)RR
Masonary work in the ratio 1:5
(b)PCC in the
ratio 1:3:6
©Cement
concrete (1:2:4) |
Cum
Cum
Cum |
3000
400
50 |
|
|
|
Total |
|
|
|
|
(ANNEXURE-III)
SCHEDULE OF QUANTITIES FOR CONSTRUCTION OF ONE NO 132 KV BAY AT
JAGATSINGHPUR
Sl.
No. |
Description
of materials. |
Qty. to be
supplied. |
SUPPLY |
Installation
& commissioning. |
Grand total
(Rs.) |
(A) |
132 KV side. |
|
Unit
Ex-works. |
Ex-works
price. |
Taxes &
Duties. |
Frt. & Ins. |
FOR
destination |
Unit price. |
Total price. |
1. |
Supply,
erection, testing and commissioning of 132 KV SF-6 Breaker including
foundation as per the technical specification including GI Structurals for
132KV SF-6 Breaker and as per the direction of the engineer in
charge. |
1 sets. |
|
|
|
|
|
|
|
|
2. |
Supply,
erection, testing and commissioning of 132 KV SI with E/S as per the
technical specification and direction of engineer in charge for 132KV SI
with E/S(Beam mounted). |
1 set. |
|
|
|
|
|
|
|
|
3. |
Supply,
erection, testing and commissioning of 132 KV D/I without E/S including
foundation and GI structurals as per the technical specification 132KV SI
without E/S. |
1 set. |
|
|
|
|
|
|
|
|
4. |
Supply,
erection, testing and commissioning of 132 KV CT including foundation and
GI structurals as per the technical specification the following 132KV CT (1
phase) of 800-400/1-1-1-1-1 Amp
A)For
Feeder-3 Nos
|
3 Nos. |
|
|
|
|
|
|
|
|
5 |
Supply,
erection, testing and commissioning of 120 KV LA including foundation and GI
structurals as per the technical specification the following 120 KV LAs
a)For
feeder-3 Nos
|
3 Nos. |
|
|
|
|
|
|
|
|
6. |
Supply,
erection, testing and commissioning of 132 KV CR Panels for feeders
including making foundation for the 132 KV Duplex type CR Panel (FEEDERS)
as per specification with supply and fabrication of 100mmX50 mm Channel for
CR Panelbase with 100X116 mm RS Joiststand and 6.0 mm thickchequered
plateplat formfor inner passage, 45mmX45MMx5 mmMS Angles for floors, 150 mm
80 schedule PVC Pipes for cables from cable trencg to respective CR
including supply of all materials, labour and T&P . |
1 No. |
|
|
|
|
|
|
|
|
7. |
Supply,
erection, testing and commissioning of as per the technical specification
the 132 KV Tension insulators strings with 160 KN, Antifog type Zinc sleeve
insulators and H.W. Fittings for ACSR Zebra Conductor. |
15 sets. |
|
|
|
|
|
|
|
|
8. |
Supply,
erection, testing and commissioning of 132 KV suspension insulators strings
with 120 KN Antifog type Zinc sleeve insulators with H.W. fittings for ACSR
Zebra conductor. |
12 sets. |
|
|
|
|
|
|
|
|
9. |
Supply,
erection, testing and commissioning of PI including supply of GI structurals,
making foundation as per the technical specification the 132 KV P.I. |
4
Nos. |
|
|
|
|
|
|
|
|
10 |
Supply,
erection, testing and commissioning of the following sizes of unarmoured
cables including supply of cable markers, ferrules, lugs, glands and
termination of the cables
a)2.5
Sq .mmX4 Core
b)2.5 Sq.mmX10 Core
c)2.5 Sq.mmX16 Core |
2 KM
2 KM
1 KM
|
|
|
|
|
|
|
|
|
11 |
Supply and
fixing of all accessories like GI cable racks, trays, conduits, bends,
junction boxes etc. for the entire feeder bay cabling and other work.. |
Lots |
|
|
|
|
|
|
|
|
12 |
Supply of all
materials, design of earth grid for the optimum capacity of the feeder bay,
earth mat, earthing system of the switch yard , erection with Extending the
earthing to all equipment, panels by using adequate size of GI strips. The
earth Grid shall be inter connected to the existing earth mat. The maximum
distance between the earth wire shh be 5000 mm and the size of the gI flats
shal be 75 mm X8 mm. |
Lots |
|
|
|
|
|
|
|
|
13 |
Designing the
Complete 132 KV feeder bay lighting system of the switch yard including
supply of all labour and materials. |
Lots |
|
|
|
|
|
|
|
|
14 |
Complete
Lightning Protection of the feeder bay area and the switch yard with supply
of all labour, materials like spikes, risers, Shield wires, clamps,
connectors earth electrodes, GI flats of adequate size etc. |
Lots |
|
|
|
|
|
|
|
|
15 |
Bus Bar
Stringing for the Feeder Bay including supply of all materials and labour,
With ACSR Zebra conductors, clamps, insulators, Hard wares as per
specification and the direction of the engineer in charge. |
Lots |
|
|
|
|
|
|
|
|
16 |
Supply of all
materials, conductor, clamps and hardwares and jumpering to all equipment,
switch -gears and the bus bar as per actual requirement for the feeder bay. |
Lots |
|
|
|
|
|
|
|
|
17 |
Preparation
of the Cable Schedule for the 132 KV feeder Bay |
Lots |
|
|
|
|
|
|
|
|
18 |
Supply of all
materials ,T&P, Labour, Designing and making control cable and power cable
trench of the entire switch yard and control room as per requirement as
follows in RCC in the ratio 1:2:4 with supply of all cement , Steel, binding
wire all coarse and fine aggregates as per requirement with supply and
fixing of top RCC Cover Slab of 75 mm thick.
600 mmX900 mm
size with150 mm thick RCC Wall and 150 mm base slab including supply of all
materials, labour and T&P
|
|
|
|
|
|
|
|
|
|
|
(a)600
mmX600mm of 200 mm thick wall(Double side)
(b) 450
mmX450mm of 200 mm thick wall(Double side)
|
20 Mtrs
50 Mtrs |
|
|
|
|
|
|
|
|
20 |
Supply of all
materials ,T&P, Labour, Designing entire fencing of the Feeder bay matching
to the existing fencing ,with Random Rubbles retaining wall, all GI fencing
channels, GI Goat mesh of 6 SWG Hot Dip chain link fencing with 50X5 mmGI
Flat 3 rows wilded back to back in both side or boltedwith GI Chanel by
providing 10 mm dia GI Bolts and nuts. as per requirement including
foundation execution in RCC in the ratio 1:2:4 with supply of all cement ,
Steel, all channels , all goat mesh all coarse and fine aggregates and
supply and putting of two nos of gates at different locations as per the
direction of the engineer in charge . |
Lots |
|
|
|
|
|
|
|
|
21 |
Supply,
Erection, testing and commissioning of CT and CVT out door type console
boxes , Bay marshaling boxes made out of 2.0 mm CR Sheets Including making
of foundations including supply of all materials, labour and T&P. |
Lots as per
S/S requirement for both 132 KV and 33 KV. |
|
|
|
|
|
|
|
|
22 |
|
Lot |
|
|
|
|
|
|
|
|
23 |
Supply of
adequate nos of HT Grade Rubber Mats for the control room panels including
supply of all materials, labour and T&P. |
Lot |
|
|
|
|
|
|
|
|
24 |
Deposit of
all statutary fees, getting inspected from the statutary authority |
Lot |
|
|
|
|
|
|
|
|
25 |
Entire S/S
i.e 132 KV and 33 KV Switchyard HG metal spreading including supply of 40 mm
uniform machine broken HG metal in a thickness of 150 mm with supply of all
labour and T&P. |
Lots |
|
|
|
|
|
|
|
|
26 |
Switch Yard
river clearsand filling including supply of clear river sand, all labour and
T&P to maintain the R.L.
|
2600 Cum |
|
|
|
|
|
|
|
|
27 |
Supply,
erection, testing and commissioning of 132 KV CVT including GI structural
and making foundation as per the technical specification for the CVT. |
3 nos |
|
|
|
|
|
|
|
|
28 |
Supply,
erection, testing and commissioning of 132 KV wave Trap including GI
structural and making foundation as per the technical specification for the
132KV Wave Trap. |
2 Nos |
|
|
|
|
|
|
|
|
29 |
Supply,
laying , testing and commissioning of coaxial cables as per specification
for the PLCC arrangement at Purusottampur including supply of heavy gauge
PVC pipes, clamps , shaddles for laying of the cable |
500 mtrs |
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
|
|
|
|
|
|
|
(ANNEXURE-IV)
BILL OF QUANTITIES OF TOWER MATERIALS, EQUIPMENT STRUCTURALS TO
BE SUPPLIED BY THE CONTRACTOR FOR THE 132 KV BAY EXTENTION WORK
AT JAGATSINGHPUR
Sl.
No. |
Description of the material |
UNIT |
SUPPLY |
Installation and commissioning |
Grand
Total Rs. |
Unit Ex.
Works |
Total Exworks |
Taxes and
duties |
Frt. & Ins. |
FOR
Destination |
Unit Price |
Total Price |
1 |
Galvanised
tower structuralsupply and erection including fundation as per instruction
of engineer in charge and technical specification including supply of all
materials, consumables, sundries, all GI Bolts Nuts, washers, etc |
|
|
|
|
|
|
|
|
|
A |
132 KV columns supply and
erection with supply of all T&P and Labour |
|
|
|
|
|
|
|
|
|
|
a)T1S, 15.0 mtr high column with
peak and spike-7.158 MT(6 Nos) |
5
|
|
|
|
|
|
|
|
|
|
b) T4S, 11.0 mtr high column with
peak and spik-0.930 MT(1 No) |
1 No |
|
|
|
|
|
|
|
|
B |
GALVANISED 132 KV BEAMS |
|
|
|
|
|
|
|
|
|
|
a)G-1 Type10.4.0 mtr long with all
bracing members as per drawing |
4 Nos
=0.618X4=2.472 MT |
|
|
|
|
|
|
|
|
|
b) G-2 Type 14.9875 Mtr long
withal bracing |
2Nos=0.907X2=1.814 MT |
|
|
|
|
|
|
|
|
|
TOTAL |
12.3740
MT |
|
|
|
|
|
|
|
|
(ANNEXURE-V)
SCHEDULE OF QUANTITIES FOR CONSTRUCTION OF ONE NO 132 KV BAY AT
PARADEEP GRID SUB-STATION
Sl.
No. |
Description
of materials. |
Qty. to be
supplied. |
SUPPLY |
Installation
& commissioning. |
Grand total
(Rs.) |
(A) |
132 KV side. |
|
Unit
Ex-works. |
Ex-works
price. |
Taxes &
Duties. |
Frt. & Ins. |
FOR
destination |
Unit price. |
Total price. |
1. |
Supply,
erection, testing and commissioning of 132 KV SF-6 Breaker including
foundation as per the technical specification including GI Structurals for
132KV SF-6 Breaker and as per the direction of the engineer in
charge. |
1 sets. |
|
|
|
|
|
|
|
|
2. |
Supply,
erection, testing and commissioning of 132 KV SI with E/S as per the
technical specification and direction of engineer in charge for 132KV SI
with E/S(Beam mounted). |
1 set. |
|
|
|
|
|
|
|
|
3. |
Supply,
erection, testing and commissioning of 132 KV S/I without E/S including
foundation and GI structurals as per the technical specification 132KV SI
without E/S. |
4 set. |
|
|
|
|
|
|
|
|
4. |
Supply,
erection, testing and commissioning of 132 KV CT including foundation and
GI structurals as per the technical specification the following 132KV CT (1
phase) of 800-400/1-1-1-1-1 Amp
A)For
Feeder-3 Nos
|
3 Nos. |
|
|
|
|
|
|
|
|
5 |
Supply,
erection, testing and commissioning of 120 KV LA including foundation and GI
structurals as per the technical specification the following 120 KV LAs
a)For
feeder-3 Nos
|
3 Nos. |
|
|
|
|
|
|
|
|
6. |
Supply,
erection, testing and commissioning of 132 KV CR Panels for feeders
including making foundation for the 132 KV Duplex type CR Panel (FEEDERS)
as per specification with supply and fabrication of 100mmX50 mm Channel for
CR Panelbase with 100X116 mm RS Joiststand and 6.0 mm thickchequered
plateplat formfor inner passage, 45mmX45MMx5 mmMS Angles for floors, 150 mm
80 schedule PVC Pipes for cables from cable trencg to respective CR
including supply of all materials, labour and T&P . |
1 No. |
|
|
|
|
|
|
|
|
7. |
Supply,
erection, testing and commissioning of as per the technical specification
the 132 KV Tension insulators strings with 160 KN, Antifog type Zinc sleeve
insulators and H.W. Fittings for ACSR Zebra Conductor. |
15 sets. |
|
|
|
|
|
|
|
|
8. |
Supply,
erection, testing and commissioning of 132 KV suspension insulators strings
with 120 KN Antifog type Zinc sleeve insulators with H.W. fittings for ACSR
Zebra conductor. |
12 sets. |
|
|
|
|
|
|
|
|
9. |
Supply,
erection, testing and commissioning of PI including supply of GI structurals,
making foundation as per the technical specification the 132 KV P.I. |
4
Nos. |
|
|
|
|
|
|
|
|
10 |
Supply,
erection, testing and commissioning of the following sizes of unarmoured
cables including supply of cable markers, ferrules, lugs, glands and
termination of the cables
a)2.5
Sq .mmX4 Core
b)2.5 Sq.mmX10 Core
c)2.5 Sq.mmX16 Core |
2 KM
2 KM
1 KM
|
|
|
|
|
|
|
|
|
11 |
Supply and
fixing of all accessories like GI cable racks, trays, conduits, bends,
junction boxes etc. for the entire feeder bay cabling and other work.. |
Lots |
|
|
|
|
|
|
|
|
12 |
Supply of all
materials, design of earth grid for the optimum capacity of the feeder bay,
earth mat, earthing system of the switch yard , erection with Extending the
earthing to all equipment, panels by using adequate size of GI strips. The
earth Grid shall be inter connected to the existing earth mat. The maximum
distance between the earth wire shh be 5000 mm and the size of the gI flats
shal be 75 mm X8 mm. |
Lots |
|
|
|
|
|
|
|
|
13 |
Designing the
Complete 132 KV feeder bay lighting system of the switch yard including
supply of all labour and materials. |
Lots |
|
|
|
|
|
|
|
|
14 |
Complete
Lightning Protection of the feeder bay area and the switch yard with supply
of all labour, materials like spikes, risers, Shield wires, clamps,
connectors earth electrodes, GI flats of adequate size etc. |
Lots |
|
|
|
|
|
|
|
|
15 |
Bus Bar
Stringing for the Feeder Bay including supply of all materials and labour,
With ACSR Zebra conductors, clamps, insulators, Hard wares as per
specification and the direction of the engineer in charge. |
Lots |
|
|
|
|
|
|
|
|
16 |
Supply of all
materials, conductor, clamps and hardwares and jumpering to all equipment,
switch -gears and the bus bar as per actual requirement for the feeder bay. |
Lots |
|
|
|
|
|
|
|
|
17 |
Preparation
of the Cable Schedule for the 132 KV feeder Bay |
Lots |
|
|
|
|
|
|
|
|
18 |
Supply of all
materials ,T&P, Labour, Designing and making control cable and power cable
trench of the entire switch yard and control room as per requirement as
follows in RCC in the ratio 1:2:4 with supply of all cement , Steel, binding
wire all coarse and fine aggregates as per requirement with supply and
fixing of top RCC Cover Slab of 75 mm thick.
600 mmX900 mm
size with150 mm thick RCC Wall and 150 mm base slab including supply of all
materials, labour and T&P
|
|
|
|
|
|
|
|
|
|
|
(a)600
mmX600mm of 200 mm thick wall(Double side)
(b) 450
mmX450mm of 200 mm thick wall(Double side)
|
20 Mtrs
50 Mtrs |
|
|
|
|
|
|
|
|
20 |
Supply of all
materials ,T&P, Labour, Designing entire fencing of the Feeder bay matching
to the existing fencing ,with Random Rubbles retaining wall, all GI fencing
channels, GI Goat mesh of 6 SWG Hot Dip chain link fencing with 50X5 mmGI
Flat 3 rows wilded back to back in both side or boltedwith GI Chanel by
providing 10 mm dia GI Bolts and nuts. as per requirement including
foundation execution in RCC in the ratio 1:2:4 with supply of all cement ,
Steel, all channels , all goat mesh all coarse and fine aggregates and
supply and putting of two nos of gates at different locations as per the
direction of the engineer in charge . |
Lots |
|
|
|
|
|
|
|
|
21 |
Supply,
Erection, testing and commissioning of CT and CVT out door type console
boxes , Bay marshaling boxes made out of 2.0 mm CR Sheets Including making
of foundations including supply of all materials, labour and T&P. |
Lots as per
S/S requirement for both 132 KV and 33 KV. |
|
|
|
|
|
|
|
|
22 |
|
Lot |
|
|
|
|
|
|
|
|
23 |
Supply of
adequate nos of HT Grade Rubber Mats for the control room panels including
supply of all materials, labour and T&P. |
Lot |
|
|
|
|
|
|
|
|
24 |
Deposit of
all statutary fees, getting inspected from the statutary authority |
Lot |
|
|
|
|
|
|
|
|
25 |
Entire S/S
i.e 132 KV and 33 KV Switchyard HG metal spreading including supply of 40 mm
uniform machine broken HG metal in a thickness of 150 mm with supply of all
labour and T&P. |
Lots |
|
|
|
|
|
|
|
|
26 |
Switch Yard
river clearsand filling including supply of clear river sand, all labour and
T&P to maintain the R.L.
|
2600 Cum |
|
|
|
|
|
|
|
|
27 |
Supply,
erection, testing and commissioning of 132 KV CVT including GI structural
and making foundation as per the technical specification for the CVT. |
3 nos |
|
|
|
|
|
|
|
|
28 |
Supply,
erection, testing and commissioning of 132 KV wave Trap including GI
structural and making foundation as per the technical specification for the
132KV Wave Trap. |
2 Nos |
|
|
|
|
|
|
|
|
29 |
Supply,
laying , testing and commissioning of coaxial cables as per specification
for the PLCC arrangement at Purusottampur including supply of heavy gauge
PVC pipes, clamps , shaddles for laying of the cable |
500 mtrs |
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
|
|
|
|
|
|
|
(ANNEXURE-VI)
BILL OF QUANTITIES OF TOWER MATERIALS, EQUIPMENT STRUCTURALS TO
BE SUPPLIED BY THE CONTRACTOR FOR THE 132 KV BAY EXTENTION WORK
AT PARADEEP
Sl.
No. |
Description of the material |
UNIT |
SUPPLY |
Installation and commissioning |
Grand
Total Rs. |
Unit Ex.
Works |
Total Exworks |
Taxes and
duties |
Frt. & Ins. |
FOR
Destination |
Unit Price |
Total Price |
1 |
Galvanised
tower structuralsupply and erection including fundation as per instruction
of engineer in charge and technical specification including supply of all
materials, consumables, sundries, all GI Bolts Nuts, washers, etc |
|
|
|
|
|
|
|
|
|
A |
132 KV columns supply and
erection with supply of all T&P and Labour |
|
|
|
|
|
|
|
|
|
|
a)T1S, 15.0 mtr high column with
peak and spike-7.158 MT(6 Nos) |
5
|
|
|
|
|
|
|
|
|
|
b) T4S, 11.0 mtr high column with
peak and spik-0.930 MT(1 No) |
1 No |
|
|
|
|
|
|
|
|
B |
GALVANISED 132 KV BEAMS |
|
|
|
|
|
|
|
|
|
|
a)G-1 Type10.4.0 mtr long with all
bracing members as per drawing |
4 Nos
=0.618X4=2.472 MT |
|
|
|
|
|
|
|
|
|
b) G-2 Type 14.9875 Mtr long
withal bracing |
2Nos=0.907X2=1.814 MT |
|
|
|
|
|
|
|
|
|
TOTAL |
12.3740
MT |
|
|
|
|
|
|
|
|
SCHEDULE OF QUANTITIES FOR CIVIL WORK OF
PURUSOTTAMPUR GRID SUB STATION TO BE QUOTED BY THE CONTRACTOR
UNDER PACKAGE-I, placed at the end of the price schedule
|